DVRPC has published over one thousand reports from the 1970s to present. Product abstracts and/or PDF downloads are available.
June 1, 1985

This study has analyzed the ridership potential of the Newtown Branch Rail Line as part of a feasibility study of electifying the line from Fox Chase to Newtown.
April 1, 1984

This study of the Burlington County Corridor is intended to identify other means to satisfy the transportation needs of this corridor and investigate the compatibility of existing and proposed growth patterns with transportation facility improvements that can be implemented. This study identify transportation problems that will be analyzed in detail in future work programs. A parallel study is being……
January 1, 1970

The purpose of the study was to determine the primary flow of traffic by trip purpose in the area, as well as identifying what routes are used to access the area. A mail-back survey form was developed for motorists that required the respondent to state his trip origin and destination and what highways would be used fo that trip. The survey also attempted to determine the duration of each trip, trip……