98229 |
This project is a bridge replacement of 59th Street over AMTRAK in the City of Philadelpia.
The current structure was built in 1926, and consists of a four simple-span, partially concrete-encased-steel girder/floorbeam/jackarch superstructure atop reinforced concrete abutment and pier substructures. The anticipated work includes demolition and removal of the existing superstructure and portions of the existing reinforced concrete abutments & piers and construction of a new steel multi-girder bridge with reinforced concrete composite deck atop reinforced concrete abutments and piers; as well as roadway approach reconstruction and repaving, curb and sidewalk reconstruction, a new high-quality bicycle facility, streetlighting improvements, ADA accessibility improvements, railroad electric traction (ET) system modification and utility relocations, and other related work.
A final alternative for bridge rehabilitation or replacement is determined upon federal National Environmental Policy Act (NEPA) or state Categorical Exclusion clearance.
This project is a component of the County Bridge Line Item (MPMS #95447).
| Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
|---|---|---|---|---|---|---|
| CON | LOC | $0 | $66 | $324 | $497 | $1207 |
| CON | BRIP | $0 | $0 | $0 | $0 | $1918 |
| UTL | LOC | $477 | $1145 | $0 | $0 | $0 |
| UTL | BOF | $1906 | $4578 | $0 | $0 | $0 |
| CON | BOF | $0 | $1055 | $5192 | $7954 | $17392 |
| CON | 183 | $0 | $197 | $973 | $1491 | $3621 |
| Program Year Totals: | $ | $ | $ | $ | ||
| Total FY25-FY28 Cost: | $ | Total FY25-FY36 Cost: | $ | |||
| All costs in thousands. | ||||||