81915 | Districtwide SWM/MS4 Improvements Group 2
11 Stormwater Control Measure (SCM) sites across District 6-0 owned and maintained by PennDOT, that are under performing or pose a risk to safety of the surrounding area are proposed to be upgraded and strengthened in order to increase resiliency and improve performance of surface transportation assets. These SCMs have been identified through the Visual Site Inspections (VSI's) and Condition Assessment Inspections (CAIs) which are occurring as part of the statewide NPDES/MS-4 stormwater compliance program. Specific site work may include but is not limited to installing rock protection, inlet and outlet structure upgrades, stabilizing areas of erosion, and increasing or improving adjacent roadway drainage systems to prevent flooding.
Proposed resilience improvements include:
1) rehabilitation and improvement of an existing eligible surface transportation facility,
2) incorporation of natural infrastructure,
3) strengthening systems that remove rainwater from surface transportation facilities, and
4) upgrades to and installation of structural stormwater controls.
Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
---|---|---|---|---|---|---|
PE | PRTCT | $185 | $0 | $0 | $0 | $0 |
CON | PRTCT | $1060 | $0 | $0 | $0 | $0 |
Program Year Totals: | $1,245 | $0 | $0 | $0 | ||
Total FY25-FY28 Cost: | $1,245 | Total FY25-FY36 Cost: | $1,245 | |||
All costs in thousands. |