50634 | (Bucks County)
This is a 3R project from Kulp Road to PA 611 and is approximately 2.8 miles in length. The existing roadway consists of two 10’ lanes and intermittent shoulders that vary from 2’ to 12’. The proposed roadway will consist of milling and overlay and widening to provide two 11’ lanes and 5’ shoulders. A left turn lane southbound at Titus Ave. will be added. Existing sidewalk and curb is intermittent and will remain/replaced in-kind. One bridge will be replaced and will match the roadway cross section. This project will be coordinated with MPMS #64779.
Typical components of a "3R" project include base repair, milling, overlay, resurfacing, drainage improvements, signal modernization, and guiderail improvements. The intent of a "3R" project is to make improvements necessary to bring the road up to current standards.
| Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
|---|---|---|---|---|---|---|
| FD | STU | $296 | $0 | $0 | $0 | $0 |
| FD | 581 | $74 | $0 | $0 | $0 | $0 |
| CON | 581 | $88 | $0 | $0 | $0 | $0 |
| CON | NHPP | $353 | $0 | $0 | $0 | $0 |
| Program Year Totals: | $ | $ | $ | $ | ||
| Total FY25-FY28 Cost: | $ | Total FY25-FY36 Cost: | $ | |||
| All costs in thousands. | ||||||