120910 | (Delaware County)
The existing bridge is a 19' long single span structure that was constructed in 1935. The existing bridge is in overall poor condition and posted with a 36 ton (40 ton combination) weight restrictions. The existing bridge is narrow and does not provide a safe walking space for pedestrians.
The proposed project will replace and widen the bridge on a similar alignment.
Limits: Between Melrose Terrace and 5th Avenue
| Phase | Fund | FY25 | FY26 | FY27 | FY28 | FY29-36 |
|---|---|---|---|---|---|---|
| PE | 185 | $500 | $0 | $0 | $0 | $0 |
| CON | 185 | $0 | $0 | $0 | $0 | $1500 |
| UTL | 185 | $0 | $0 | $0 | $100 | $0 |
| FD | STU | $0 | $0 | $500 | $0 | $0 |
| ROW | STU | $0 | $0 | $100 | $0 | $0 |
| ROW | TOLL | $0 | $0 | $0 | $0 | $0 |
| FD | TOLL | $0 | $0 | $0 | $0 | $0 |
| Program Year Totals: | $ | $ | $ | $ | ||
| Total FY25-FY28 Cost: | $ | Total FY25-FY36 Cost: | $ | |||
| All costs in thousands. | ||||||