115440 |

This project will implement countermeasures to improve safety along Washington Ln (SR 4019) from Stenton Ave (SR 4002) to Cheltenham Ave (SR 0309) in the City of Philadelphia. Pedestal mounted signal head will be converted to overhead mast arms including the installation of retroreflective back plates and coordination of signals along the corridor. Pedestrian safety improvements include the installation of pedestrian countdown signals at signalized intersections and the installation of curb bump outs at high pedestrian volume intersections. The installation of raised crosswalks and flashing beacons at the 76th St/Briar Road intersection is also planned as part of this project.

Limits: Stenton Ave to Cheltenham Ave

FY2025 TIP for PA Program Years (in Thousands)

PhaseFundFY25FY26FY27FY28FY29-36
CONHSIP$0$3450$0$0$0
Program Year Totals:$$$$ 
Total FY25-FY28 Cost:$Total FY25-FY36 Cost:$ 
All costs in thousands.

No milestones are available for this project.