❮ Back
Comment

X07A | Bridge Inspection (Various)

This program will provide funding for inspection of highway-carrying state NBIS bridges and local NBIS bridges as required by federal regulations. Also, this program enables the in-depth scour evaluation of potentially scour susceptible bridges, load rating calculations, overweight truck analysis, and NHI trainings.

Limits: Bridge Inspection, State NBIS Bridges
Air Quality Code: X3

FFY2026 Draft TIP for NJ (FFY26-FFY29) Program Years (in Millions)

PhaseFundFY26FY27FY28FY29LFY30-35
ConstructionNHPP$17.500$16.000$17.500$16.000$87.220
ConstructionSTBGP-FLEX$9.700$11.700$9.700$11.700$55.480
ConstructionSTBGP-OS-BRDG$8.000$8.000$8.000$8.000$48.000
Program Year Totals:$35.200$35.700$35.200$35.700
Total FY26-FY29 Cost:$141.800Total FY26-FY35 Cost:$332.500 
All costs in millions.

No milestones are available for this project.