T05 | Bridge and Tunnel Rehabilitation (Various)
This program funds the design, repair, rehabilitation, replacement, painting, and inspection of tunnels and bridges. The program funds other work related to the movable bridge program, drawbridge power program, and right-of-way improvements necessary to maintain a State of Good Repair (SOGR) for culverts, bridges, and tunnels.
Limits: Bridge and Tunnel Rehabilitation
Air Quality Code: M9
Phase | Fund | FY26 | FY27 | FY28 | FY29 | LFY30-35 |
---|---|---|---|---|---|---|
Construction | STATE | $0.970 | $0.970 | $0.970 | $0.970 | $5.822 |
Construction | STBGP-OS-BRDG | $39.100 | $0 | $0 | $0 | $0 |
Program Year Totals: | $40.070 | $0.970 | $0.970 | $0.970 | ||
Total FY26-FY29 Cost: | $42.980 | Total FY26-FY35 Cost: | $48.802 | |||
All costs in millions. |