❮ Back
Comment

09316 | Culvert Replacement Program (Various)

This program provides funding for Culvert replacements based on results of the culvert inspection program. In the majority of cases, culverts will be replaced in the same location, with basically the same waterway opening size, and will require minimal utility involvement.

Limits: Culvert Replacement Program
Air Quality Code: S2

FFY2026 Draft TIP for NJ (FFY26-FFY29) Program Years (in Millions)

PhaseFundFY26FY27FY28FY29LFY30-35
ConstructionSTATE$0.500$1.000$1.000$1.000$7.000
ConstructionSTBGP-FLEX$2.000$2.000$2.000$2.000$10.400
Program Year Totals:$2.500$3.000$3.000$3.000
Total FY26-FY29 Cost:$11.500Total FY26-FY35 Cost:$28.900 
All costs in millions.

No milestones are available for this project.