❮ Back

09316 |

This program provides funding for Culvert replacements based on results of the culvert inspection program. In the majority of cases, culverts will be replaced in the same location, with basically the same waterway opening size, and will require minimal utility involvement.

Limits: Culvert Replacement Program

FFY2026 TIP for NJ (FFY26-FFY29) Program Years (in Millions)

PhaseFundFY26FY27FY28FY29LFY30-35
ConstructionSTBGP-FLEX$2.000$2.000$2.000$2.000$10.400
ConstructionSTATE$0.500$1.000$1.000$1.000$7.000
Program Year Totals:
Total FY26-FY29 Cost:Total FY26-FY35 Cost: 
All costs in millions.

No milestones are available for this project.