Newsletters and Technical Reports
Technical Reports
Recent technical analysis and research by CMP staff.
- Using Operations Data for Planning in the Delaware Valley: First Steps
- Selecting Software to Evaluate the Anticipated Effectiveness of CMP Strategies
Status of Supplemental Projects
There will be an annual update on the status of efforts included as commitments to projects that add single-occupancy vehicle capacity.
- 2010 Supplemental Projects Status Memorandum
- 2009 Supplemental Projects Status Memorandum
- 2008 Supplemental Projects Status Memorandum [0.2 MB .pdf]
- 2007 Supplemental Projects Status Memorandum [0.2 MB .pdf]
Outreach Materials
These will include a periodic newsletter focusing on one highly congested subcorridor at a time
- Article in PA Borough News Magazine
"A Calming Presence – Making the congestion management process work" [0.4 MB pdf] - Newsletter: Volume 3 PA: Wawa-Painters Crossroads
(note: best printed in color, double-sided on 11x17" paper) - Newsletter: Volume 2 NJ: CR 541 Corridor
(note: best printed in color, double-sided on 11x17" paper) - Newsletter: Volume 2 PA: US 30 Corridor
(note: best printed in color, double-sided on 11x17" paper) - Newsletter: Can we Reduce Congestion in the Delaware Valley
(note: best printed in color, double-sided on 11x17" paper) - Newsletter: Volume 1 NJ: Atlantic City Expressway and NJ 42 Corridor
(note: best printed in color, double-sided on 11x17" paper) - Newsletter: Volume 1 PA: US 422 Corridor
(note: best printed in color, double-sided on 11x17" paper) - 2007 Annual On-site DOT Meetings Handout: How the CMP Gets Us There [0.1 MB .pdf]
(with CMP & Project Development diagram)



